§ 15.20.010. Fees.


Latest version.
  • The following fees apply to the permits issued by the plan commission and the building department:

    Single Family Residential and Two-Family New Construction and Additions
    Fees include square footage for living area, bonus room, attached garage
    One and Two-Family Residential Base Fee $250.00, plus $0.15 per sq. ft.
    Open Frame Porch $100.00
    Enclosed Frame Porch $ 200.00
    Open Deck $75.00
    Residential Demolition $75.00

     

    Multi-Family Residential: New Construction and Additions
    New Construction and Additions $500.00 per unit, plus $0.15 per sq. ft.

     

    Manufactured Home Park Districts (MP)
    Mobile Home (Residential Manufactured Home Community) (includes electric) $300.00

     

    Alterations, Repairs, or Remodeling to all Residential Structures
    Interior Remodel $0.15 sq. ft. with a minimum of $85.00
    Exterior Remodel (includes re-roofs) $65.00

     

    Accessory Buildings, Agricultural Buildings and Detached Garages, New Construction and Additions
    80 sq. ft. to 1,300 sq. ft. $100.00
    1,301 sq. ft. to 2,399 sq. ft. $150.00
    2,400 sq. ft and larger $200.00
    Accessory Structure Demolition $75.00

     

    Accessory Buildings—Alterations, Repairs, or Remodels to Accessory Structures and Detached Garage
    Interior $85.00
    Exterior $65.00

     

    Above-ground and In-ground Pool
    In-ground Pool $100.00
    Above Ground Pool $75.00
    Fence $50.00

     

    Electrical
    Permanent, Temporary, Upgrade or Generator $75.00

     

    Commercial, Industrial and Non-residential Uses
    Primary structure use is non-residential. This fee structure includes structures used for Use Variances and as granted by the Board of Zoning Appeals
    New Construction and Addition Base fee $300.00, plus $0.20 per sq. ft.Maximum $10,000.00 for the ground floor elevation. Plus $0.20 per sq. ft.; Maximum $5,000.00 for every floor above and below ground level
    Alterations, Repairs and Remodels Base fee $200.00 plus $0.20 per sq. ft.
    Maximum $10,000.00
    Commercial Re-roof $130.00
    Mini-warehouse, New Construction and Additions Base fee $200.00 plus $0.08 per sq. ft.
    Outdoor Advertising Structures (new or modified) $300.00
    Permanent Ground Sign $200.00
    Permanent Wall Sign $100.00
    Temporary Event Sign $40.00
    Solid Waste Facility $1,000.00
    Wind Energy Conversion Systems (large) per tower $500.00
    Wind Energy Conversion Systems (small on-site) $100.00
    Solar Energy Conversion Systems (large) $2,500.00
    Solar Energy Conversion Systems (small on-site) $100.00
    Commercial Demolition Permit $150.00
    Parking Lot Expansion (more than four spaces) $450.00

     

    Telecommunication Towers and all other Towers
    New Construction (Towers and Equipment) $1,250.00
    Antennas, Cell, TV or Microwave $500.00 each

     

    Early Bird Fine
    Start construction prior to permit issuance The amount of the permit × (times) 2 (e.g. $100.00 = $100.00 × 2 = $200.00)

     

    Re-inspection Fee
    Erosion control measures not in place or in need of maintenance, re-inspection after Red Card is issued by Plan Commission Office and/or Building Department $100.00

     

    Plan Commission
    Primary Plat, Secondary Plat, Replat and Development Plan Applications (Fee paid when application has been deemed complete. Staff will notify petitioner when application is complete)
    Primary, Secondary and Replats Base Fee $650.00 Plus $12.00 per lot
    Development Plan Applications Base Fee $650.00 Plus $12.00 per acre
    Amendments $650.00
    PUD Concept Plan $650.00
    PUD Detailed Plan Base Fee $650.00 plus, $12.00 per acre
    PUD Final Plan Base Fee $650.00 plus, $12.00 per acre
    Vacation of Subdivision $400.00
    Easements (and Right-of-Way) Modification, Termination or Vacations $250.00
    Zoning verification or re-build letter $40.00
    Appeals from the Development Review Committee/Plat Committee and Administrative Decisions $150.00
    Special Meeting $1,200.00
    Design Waiver $500.00
    Design Waiver Stormwater $600.00 plus independent stormwater review

     

    Development Review Committee/Plat Committee and Administrative Review
    Minor Subdivision (incl. primary, secondary) Replat of Minor Sub. $500.00
    Development Plan $500.00
    Administrative Subdivision $150.00
    Administrative Development Plan $200.00
    Administrative PUD Secondary Plat $350.00

     

    Independent Stormwater Review
    Residential Subdivisions $125.00 plus
    $25.00 per lot or
    $40.00 per acre
    (whichever is greater)
    Commercial/Industrial Subdivisions Development Plan and Parking Lot Expansion $125.00 plus
    $55.00 per lot or
    $55.00 per acre
    (whichever is greater)
    Field Inspection after submission of As-built Plans (fee to be paid to release of Performance Guarantees) $200.00
    If substantial changes are made to a Primary Plat Application during the review process prior to the Plan Commission hearing, the independent stormwater engineer may charge an hourly rate above the fee stated in this schedule. Said fee structure is shown below. Said fee covers two reviews; after two reviews, an hourly rate will be charged in addition to calculated fee
    Administrative Fee $100.00

     

    Independent Stormwater and Erosion Control Review
    Registered Engineer $125.00 per hour
    Registered Land Surveyor $125.00 per hour
    Non-registered Engineer $100.00 per hour
    Technician $85.00 per hour
    Clerical $55.00 per hour
    Mileage Current federal rate
    Administrative Processing Fee $100.00
    Fees shall be collected for the Erosion Control Review prior to the Plan Commission hearing. Failure to submit plan prior to said hearing will result in automatic continuance of case.

     

    Subdivision and Development Plan Infrastructure Inspection—Engineer
    Registered Engineer $125.00 per hour
    Registered Land Surveyor $125.00 per hour
    Engineering Intern $100.00 per hour
    Technician $85.00 per hour
    Topographic Survey Crew $175.00 per hour
    One Person GPS Crew $160.00 per hour
    CAD Technician $80.00 per hour
    Mileage Current Federal Rate

     

    Site Improvement/Erosion Permit
    Subdivision, PUDs, and Development Plans (permits are not required for One and Two-family residential construction permits) $200.00
    Early Bird Construction Fine
    Infrastructure construction prior to approval as per Porter County UDO
    $50.00 per day, up to $2,500.00

     

    Temporary Use Permits
    Contractor's Trailer (includes electrical) $80.00/annual renewal
    Farm Stand (includes electrical) $80.00/annual renewal
    Model Home $80.00/annual renewal

     

    Board of Zoning Appeals
    Development Standards Variances
    (Chapters 2 and 5 UDO)
    $375.00
    Development Standards Variances,
    Subdivision, Development Plan (Chapter 7 UDO)
    $500.00
    Development Standards Variance
    (Chapter 7.28 Stormwater Standards; General UDO)
    $600.00 - plus independent stormwater review fee (if applicable)
    Use Variance $375.00
    Special Exceptions $400.00
    Special Exceptions Use: Telecommunication Facilities over 150 feet requiring Special Exception or Use Variance $650.00
    Special Exceptions: Large WECS (Aggregate Project) $2,000.00
    Special Exception: Small WECS $250.00
    Annual Renewal of Use Variance and Temporary Certificate of Occupancy (Mobile Home) $50.00*
     *  renewal fee must be paid prior to scheduling of case for renewal to the Board of Zoning Appeals
    Appeals of the Executive Director's Decision $150.00
    Appeals of the Building Commissioner's Decision $150.00
    Home Occupations $200.00
    Mineral Extraction Permits $1,000.00
    Special Meeting $950.00

     

    Copy Fees
    8½ × 11 $0.10
    8½ × 14 $0.10
    11 × 17 $0.15
    18 × 24 $2.50
    24 × 36 $3.00
    30 × 30 $4.00
    30 × 42 $5.00

     

    Return Check Fee
    Insufficient Funds $30.00
    Payment will only be accepted in cash, cashier's check or money order after a return check has been received

     

    Plan commission fees and building department fees shall be reviewed on an annual basis prior to the first day in June. The staff of the building and planning departments with the plan commission and county commissioners shall conduct said review.

    (Ord. 07-03 § 2 (part))

(Ord. No. 08-26, § 2, 12-2-2008; Ord. No. 10-11, § 2, 7-20-2010; Ord. No. 12-10, § 2, 4-17-2012; Ord. No. 12-27, § 2, 11-20-2012)

Editor's note

Ord. No. 12-27, adopted Nov. 20, 2012, is effective January 1, 2013.